The discovery well,manolo blahnik, the Jet 1 Carl Easdale, was completed pumping oil at the rate of 65 b/d in October 1951 after a 250 gal acid treatment.
By the end of 1953, 26 producing wells drilled on 20 acre spacing had been completed.  Initial potentials ranged from a low of 7 b/d in an edge well to a high of 600 b/d in a christian shoe core well.
Development drilling continued, consisting mainly of step-out drilling and the deepening of existing wells.  Seven additional producing wells were completed.  Initial potentials of these new wells, with one exception, were less than 50 b/d.  Most of the new wells were in flank positions, and due to their relatively disappointing results the field was considered fully developed.
Additional production was later discovered within the existing wells.  The stepout flank position wells were drilled deeper than the christian louboutin core wells due to their structural position.
Hydrocarbon shows were noted to depths of nearly 2,300 ft (approximately -1,800 ft subsea).  A subsea of -1,800 ft was assumed as the fieldwide oil-water contact.
In the late 1950s a deepening program was commended that continued for about 10 years.  During this period, 13 wells were deepened an average of 50 ft using cable tools.  Before being placed on pump,ysl boots, the wells were treated down the casing with an average of 6,000 gal of acid.  Several wells experienced production increases in excess of 100 b/d.
Through the 1970s and early 1980s the operator directed its attention to other areas, and Tilden field production followed a normal decline.  By mid 1984, field production had declined below 90 b/d.

Related topics article:

Related Posts Title:

Tags: ,

Comments are closed.



Categories

Blogroll

Archives

Tags

Recent Posts

 

September 2010
M T W T F S S
« May    
 12345
6789101112
13141516171819
20212223242526
27282930  

Meta